Arrived the report on the results of geotechnical control tests
Arrived the report on the results of geotechnical control tests. According to the report, resulted in improved capacity after replacement of soil, so it now meets the generated load in comparasion to the required value.
Vaši komentari Ostavite komentar
Budite prvi koji će ostaviti komentar.


